Spring Street Project
Spring Street Bid Results #09-42
November 11, 2008 Request for Proposals
Invitation to Bid Spring Street Project #09-42
Related Projects
Marrett and Waltham
Studies
Howard Stein Hudson 2006 "Marrett Road Intersection"
Previous Public Meetings
March 16th, 2009 March 10th, 2009 February 3rd, 2009 (Open House) January 22nd, 2009 December 3rd, 2008 January 10th, 2008
Spring Street Plans
Marrett Rd - 11 Spring Street 13-37 Spring Street 37-58 Spring Street 61-82 Spring Street 82-101 Spring Street 101-124 Spring Street 112-124 W Spring Street
Engineering
|
Spring Street Project

Town Staff Contact:
David Cannon, Assistant Town Engineer 781-274-8323
Email: Spring Street Project Staff
Project Description
This project includes installation of a traffic signal at the intersection of Spring Street and Marrett Road, the addition of approximately 4,500 linear feet of sidewalk, and the installation of a granite curb along Spring Street and Marrett Road. The traffic signal will have an exclusive pedestrian phase and the sidewalks will be installed on both sides of Spring Street from Marrett Road to Hudson Road and on the westerly side (odd side) from Hudson Street to the bridge over Route 2. Pedestrian crossings along Spring Street are currently proposed at Underwood and Hudson. Traffic calming devices will also be incorporated into this project. The typical sections of the project will have 24 feet of pavement, five-foot sidewalks, granite curbing, and a grass strip between the sidewalk and the curbing. The roadway and sidewalk will be narrowed in one location in an effort to save a pair of 40" Oak Trees. Project Funding
The Town has received Massachusetts Opportunity Relocation and Expansion Jobs Capital Program Grant (MORE Grant) that has a time related performance requirement.
Project Consultant
BETA Group, 315 Norwood Park South, Norwood, MA 02062
Project Contractor
J Marchese & Sons 69 Norman Street Everett, MA 02149
Construction Schedule

|
 |