 All Permitting is online!  

Permits can be paid for via VPC, the online portal or by check or cash delivered to 201 Bedford St after the permit application has been approved.  During the application process engineering fees are displayed as estimates. Winter moratorium is from November 15th to the day after Patriot's Day and the Driveway and Right of Way Excavation Permits are disabled during this time as now work is allowed in the public right of way.

Note: to apply for most permits issued through Engineering, applicants must be on the approved paver or drainlayer list as required.  Certain types of contractors, such as those working for utility companies, are in our database as well and are allowed to dig in the right of way.  If you have questions about a contractor working in Town or you want to be added to our database, please contact engineering

 

Specifications and Requirements

General Permit Information:

Street Paving and Driveways:

Trench:

Utility- Water, Sewer & Drain:

Stormwater: